NHDOT Home  Search  Help New Hampshire
NHDOT Logo Public Interest
Spaulding Turnpike :: Newington-Dover graphic element  
 
Search this site
 
Home
Highlights
Project Process
Maps-Photos
Project Schedule
Project Contacts
Meeting Minutes
Alternatives
Advisory Task Force
Study Documents
Commonly Asked Questions
Feedback-Mailing List
Newsletter
Project Alternatives
 
The following conceptual interchange alternatives have resulted from the development and refinement of infrastructure improvement alternatives. These infrastructure alternatives, in concert with a program of Transportation System Management (TSM) actions and Transportation Demand Management (TDM) strategies, have been concurred by the Advisory Task Force as recommended to be carried forward for detailed evaluation in Phase 3 (Preliminary Design / Impact Assessment / Draft Environmental Impact Statement) of the study.


NEW! Visualizations
Click here to view the visualization renderings. Users can mouse-over the images to switch between before and after views.


View/Download Study Alternatives Here
The documents below are available for viewing/downloading. In some cases the files linked here are very large in size. A high-speed internet connection is recommended for downloading these large files. If not currently installed on your computer, you will need to download the Adobe Acrobat Reader free browser plug-in to view the PDFs.

pdf iconSelected Alternative [10MB]


pdf iconAlternative 2 [0.9MB]

pdf iconPreferred Alternative 3 [0.7MB]

pdf iconAlternative 10 [1.8MB]

pdf iconAlternative 10A [1.3MB]

pdf iconAlternative 11 [1.8MB]

pdf iconAlternative 12 [1.8MB]

pdf iconAlternative 12A [1.3MB]

pdf iconPreferred Alternative 13 [0.9MB]
 
 
divider
NH.gov  Privacy Statement  Accessibility Statement  Site Map  Contact Us Copyright